 |
SEO Projects |
 |
|
|
 |
Viaden Blogs |
 |
|
|
|
|
 |
Company Business Process
| Viaden Inc Web Site Design
Company, dealing with Web Site Design, Web Development, Logo Design
and much more, uses in its work the principles of business process,
which allow to organize the work in the most effective and logical
way, and present every process stage of Viaden Inc, concerning Web
Site Design, Web Development and other directions in a comprehensible
form for the clients of our web site design company. Each business
process stage of Viaden Inc web site design company described in the
given section contributes to the better performance of development
and achievement of the highest goals and results in the web site design
company work.
The web design company project development process is created on
the base of Rational Unified Process (RUP) - international industry
software development quality standards. The fact that all the phases
of project development comply with RUP guarantees that your website,
database or software will be implemented by in accordance with world
standards, your business needs and to your best convenience.
|
 |
Web Design Company Development Phases
| 1. |
Business
modeling. On the basis of initial requirements provided by
the customer the generic idea of the project is formed. This includes
creating a business model, classifying the task into a conforming
category, studying available solutions in the respected activity area
and developing subsequent analysis strategy.
|
| |
Steps 3-7,
approximating the project to the final phase, are performed iteratively.
|
| 2. |
Project
Planning. At this stage a more detailed and thorough analysis
of the business model is performed for the purpose of verifying its
correspondence with the current project development phase and quality
standards, possible risks are detected and a detailed plan of next
steps of the project realization is worked out. Basic application
diagrams and the site map are usually developed in our web design
company at this stage.
|
| 3. |
Requirements.
The margins of the system being developed are determined for the iteration
in question, realization subtasks are formed and their correspondence
with the given iteration and end objectives of the system is verified,
possible technical difficulties and labor-intensiveness of each subtask
are defined, project technical specification is drawn or changed.
|
| 4. |
Analysis
& Design. Major variants of system architecture and its components
are verified and confirmed, substantiation of the architecture is
done, program modules and database structure are projected.
|
| 5. |
Implementation.
System components realization model is composed, their correspondence
with the general architecture is revealed and verified, realization
modules are tested for possible joining conflicts, whereupon system
modules are realized and joined. During this stage our web design
company receives system components leveled for the iteration in question.
|
| 6. |
Testing.
Aims and methods of testing are determined and confirmed, iterative
testing of subsystems and the whole system is performed, retrieved
defects are recorded. At final iterations testing results are made
use of for approving system requirements.
|
| 7. |
Deployment.
System deployment is planned, technical aspects of deployment are
studied and verified (purchasing equipment, hosting, etc.), and additional
support means are developed, followed by beta- and production testing.
At this stage of the business process the customer receives the project
version that functions with sufficient steadiness and corresponds
to the project requirements. In case revisions or modifications are
necessary, the given version proceeds through additional iterations
of the project development process for the purpose of stability and
functionality improvement and meeting the quality standards.
|
| 8. |
Environment,
Configuration & Change management. These stages of the business
process refer to auxiliary ones and can be performed during any iterations
of the development process at our web design company. They are intended
for supplying all necessary resources (technical, informational, etc.),
providing for successful project performance and introducing timely
corrections related to modified terms or requirements that can be
revealed due to technical or organizational difficulties. |
|
|